Equipment, structure erection of Circulating Fluidized Bed Boiler 2x35T/H
- Erecting and dismantling scaffolding.
- Erection of steel structure.
- Install electrostatic precipitator.
- Install and align the fan.
- Install and align the pump, etc
Other Projects
Fabrication, installing water supply pipes across Vam Co Dong river
Overhaul for Turbine and Generator - Unit S1
Daily maintenance
Installing bucket elevator, fans - Line 3
Repair/Overcome the vibration of Turbine Unit 1