Repair/Overcome the vibration of Turbine Unit 1

Repairing and overcoming journal bearing vibration No. 3,4 Generator unit No. 1 - 60MW capacity.

  • Adjust parameters of journal bearing 3,4.
  • Repairing pillow pedestals number 3, 4.
Repair/Overcome the vibration of Turbine Unit 1

Repair and maintenance of turbine turning-device - Cao Ngan Thermal Power Plant

Repair/Overcome the vibration of Turbine Unit 1

Repair and maintenance of turbine - generator bearings - Cao Ngan Thermal Power Plant

Repair/Overcome the vibration of Turbine Unit 1

Repair and maintenance of turbine - generator bearings - Cao Ngan Thermal Power Plant

Repair/Overcome the vibration of Turbine Unit 1

Repair and maintenance of turbine - generator bearings - Cao Ngan Thermal Power Plant

Other Projects

Removal, sanitary cleaning, island working surface the Element Baskets air dryer GAH furnace 1

Removal, sanitary cleaning, island working surface the Element Baskets air dryer GAH furnace 1

View more
Cleaning the outlet pipes of pump 14P203

Cleaning the outlet pipes of pump 14P203

View more
On-line leak sealing for 110-PV-0034 valve

On-line leak sealing for 110-PV-0034 valve

View more
Installing bucket elevator, fans - Line 3

Installing bucket elevator, fans - Line 3

View more
Repairing, maintaining 41MW Steam turbine

Repairing, maintaining 41MW Steam turbine

View more
Supplying flange facing, manpower supply service

Supplying flange facing, manpower supply service

View more