Online leak repair for of reduce temperature line Furnace 1

  • Survey, calculate data, design, process and manufacture Clamp.
  • Install clamp, glue injection for online leak sealing of reduce temperature line.

Pipe line parameters:

- Pressure: 100 bar.

- Temperature: 200 degrees Celsius.

Online leak repair for of reduce temperature line Furnace 1

Leak point before repair - An Khanh Thermal Power Plant

Online leak repair for of reduce temperature line Furnace 1

The leak point was completely sealed after repairing - An Khanh Thermal Power Plant

Other Projects

Design, manufacture and installation of LNG regasification system

Design, manufacture and installation of LNG regasification system

View more
Hydro Jet-cleaning heat exchanger tubes - Overall maintenance

Hydro Jet-cleaning heat exchanger tubes - Overall maintenance

View more
Turbine Overhaul ST01101 - Gas Generation Plant

Turbine Overhaul ST01101 - Gas Generation Plant

View more
Scaffolding rental for shutdown period 2021

Scaffolding rental for shutdown period 2021

View more
Overhaul for Turbine and Generator - Unit S1

Overhaul for Turbine and Generator - Unit S1

View more
Repair and maintenance for Turbine Unit 2

Repair and maintenance for Turbine Unit 2

View more